Redevelopment

Problems in Old Buildings

Structural Damage: Over time, buildings develop cracks, rusted iron rods, and leakage which weaken the structure.

Lack of Amenities: No lifts, no parking, poor sanitation, and absence of fire-fighting systems.

High Maintenance: The cost of repairs increases every year, making it financially stressful for members.

No Resale Value: Older properties have little to no market demand and often get rejected by banks for loans.

What is Redevelopment?

Redevelopment is the process of reconstructing an old or dilapidated building into a brand-new, modern structure. It involves tearing down outdated buildings and replacing them with safer, well-equipped, and aesthetically pleasing developments—at no extra cost to the society members.

Why is Redevelopment Needed?

Buildings older than 30-40 years often become structurally unsafe, with problems like cracks, leakages, and lack of amenities. Redevelopment provides an opportunity to rebuild these properties to meet today’s safety standards and lifestyle needs.

Benefits of Redevelopment for Society Members

New Home at No Cost

Members receive a brand-new flat with additional space, better design, and superior quality construction without investing any money.

Additional Carpet Area

Depending on the project feasibility and FSI rules, members can receive more carpet area than their current flat.

Modern Amenities

New redeveloped buildings include facilities like lifts, intercom, CCTV, fire systems, garden, gym, solar systems, and rainwater harvesting.

Rent Compensation

During the construction period, members receive monthly rental compensation or temporary accommodation at the developer's cost.

Legal Protection

All documentation including MOU, Development Agreement, POA, and RERA registration is done to ensure transparency and security for all stakeholders.

Maintenance-Free Living

The new structure often comes with 5-10 years of maintenance-free warranty or a lifetime maintenance fund for the society.

REPAIRS VS REDEVELOPMENT

REPAIR
REDEVELOPMENT
The repair work can increase life of the building by 3 to 4 years and the problems can reoccur after few years
The old buildings are designed with old construction norms and hence cannot withstand with new climatic and geographic conditions. New building is constructed with new construction norms and hence can withstand with new climatic and geographic conditions.
New building is constructed with new construction norms and hence can withstand with new climatic and geographic conditions.
For repairs members have to spend money In redevelopment, members get Benefits in terms of money as well as additional area.
In redevelopment, members get Benefits in terms of money as well as additional area.
In old building the steel inside concrete beams and column starts corroding after 20 years which cannot be treated in repair.
As the building is new this issue of corrosion of steel does not arise.

WHY MERIT REDEVELOPMENT CONSULTANTS?

At Merit, we bring over 14+ years of experience and a proven record across 125+ societies. Our expert team of legal, technical, and financial advisors handles everything—from feasibility reports and legal checks to developer selection and project handover. With us, transparency and results are guaranteed.

What Sets Us Apart:

  • 5500+ families impacted

  • 50+ lakh sq. ft. under redevelopment

  • Developer Tender Management

  • Legal drafting of 80% safeguard clauses

  • Feasibility Report & PMC Supervision

  • Post-handover support

Bullet Format to Use:

  • Modern elevation with designer lobby

  • Earthquake-resistant RCC structure

  • High-speed lifts with power backup

  • Gym, clubhouse, garden, CCTV

  • Rainwater harvesting, solar panels

  • Reserved parking and recreational areas

Step-by-Step Redevelopment Process

This is how we guide your society from an old structure to a brand-new modern home—legally, technically, and financially sound.

Initiation by Members (Section 79A Rule)
Redevelopment begins when at least 1/5th of society members submit a requisition to the Secretary requesting a Special General Body Meeting (SGBM). This meeting discusses the need for redevelopment and outlines issues like structural damage, leakage, lack of amenities, etc.

  • Quorum: 2/3rd members must attend

  • If quorum fails, the meeting is postponed by 7 days

  • Resolution must be passed with minimum 51% approval

Once the resolution for redevelopment is passed, the society appoints a qualified Project Management Consultant (PMC) through majority voting. The PMC becomes the society’s expert advisor for:

  • Feasibility analysis

  • Developer shortlisting

  • Legal & financial review

  • Construction monitoring

  • End-to-end coordination

Merit Redevelopment Consultants is currently PMC for over 125 societies across Maharashtra.

The PMC conducts a detailed feasibility study, which acts as the backbone of the redevelopment decision.

Key tasks include:

  • Measurement & area verification using AutoCAD

  • FSI, TDR & zoning analysis as per latest UDCPR rules

  • Structural assessment & potential development scope

  • Developer profitability calculation

  • Carpet area & corpus estimation

This report helps the society take data-backed decisions and negotiate better offers with developers.

A transparent developer selection process begins:

  • A professional tender document is drafted and published in minimum 2 newspapers (including 1 Marathi)

  • Multiple reputed developers are invited to submit offers

  • Tenders include technical & financial qualifications, past projects, and redevelopment plans

  • A comparative chart is created showing offers, benefits, and timeline of each developer

Society, along with PMC, shortlists the most suitable developers based on value, experience, and financial strength.

From the shortlisted developers (usually 3-5), final selection is made via:

  • Site visits to ongoing or completed projects

  • Personal presentations by developers

  • Review of legal, technical, and financial capabilities

  • Developer interviews

The final decision is taken in an open voting system in presence of the Deputy Registrar or Grade-1 Officer and recorded via video.

Once the developer is finalized, a legally binding Development Agreement is signed.

Key documents and actions include:

  • MoU (Memorandum of Understanding)

  • Development Agreement with penalty clauses

  • Power of Attorney to developer

  • PAAA (Permanent Alternative Accommodation Agreement) with each member

  • RERA Registration

  • NOCs from Deputy Registrar and Municipal Authorities

The agreement includes detailed timelines, rent, corpus, area, penalty for delay, etc.

Before demolition begins, the developer provides rent compensation or temporary alternative accommodation to all members. The agreement must ensure:

  • Timely rental payment (no bank stop instructions)

  • Shifting expenses paid by developer

  • Advance rent for 6–12 months depending on project

  • Regular communication and relocation support from PMC

Once all permissions are received:

  • Demarcation, Commencement Certificate (CC) and zone certificates are obtained

  • Flats are vacated within 45 days

  • Site is secured and old structure is demolished

  • Bhoomi Pujan Ceremony marks the start of construction

  • A bar chart is shared showing construction milestones

During the construction phase, Merit PMC ensures quality, speed, and compliance:

Activities include:

  • RCC & Structural checks

  • Soil testing & seismic compliance

  • Slab level checks, DPC layer, wiring, plumbing monitoring

  • Regular site inspections, monthly reports

  • CCTV access for members

  • Amenities (lift, gym, terrace garden) are cross-checked as per tender

  • Use of standard material (TMT steel, OPC cement, river sand, etc.)

Goal: Delivery of a strong, legal, earthquake-resistant building.

After completion, the society receives:

  • Flats with Occupancy Certificate (OC)

  • All amenities as promised

  • Post-completion General Body Meeting

  • New committee formation via elections

  • Transfer of registers, documents, and PMC final report

Developers hand over corpus fund, betterment charges, and original documents to society. Society welcomes new members and begins a fresh chapter in a modern, secure environment.

At Merit Redevelopment Consultants Pvt. Ltd., we transform visions into reality. Established in 2023, we are a dynamic and innovative subsidiary of Merit Housing Solutions India Pvt. Ltd., a pioneering company in consultancy with a legacy dating back to 2009.

Contact Us

Office No.2, 3 & 5, 2nd Floor, Mokate Building, Near Shivaji Maharaj Statue, Opp. Thorat Garden, Londhe Wada, Chaitanya Nagar, Kothrud, Pune, Maharashtra.

9860696959 / 9730306060 / 9860910493 / 8600999952

merithousing@gmail.com / meritredevelopmentconsultants@gmail.com

Mon-Sat:

09:00 Am - 6:00 Pm

Our Glorious Journey

Copyright © 2025 Merit Redevelopment Consultants

Designed By Samayu Solutions❤️